CRM Implementation Checklist

Every step of a CRM implementation, from planning to 90 days post-launch — use it to track your rollout and make sure nothing gets skipped under deadline pressure.

PMD Team2 min read
CRM Implementation Checklist

Before You Start

  • Written down what "success" looks like (specific, measurable goals)

  • Mapped your actual current sales/support process — not the ideal version

  • Identified who owns the CRM project internally

  • Set a realistic launch date, with buffer for training and testing

  • Budgeted for the full project, not just the software subscription

Choosing & Planning

  • Shortlisted CRMs based on your actual requirements, not feature lists

  • Confirmed the platform integrates with your existing tools

  • Tested the top choice with a free trial and real sample data

  • Defined your pipeline stages (5–7 max) before opening any settings

  • Agreed on which fields are actually required to track

Data Migration

  • Cleaned up existing data before migrating — removed duplicates and outdated records

  • Mapped old fields to new CRM fields

  • Run a test migration on a small data sample first

  • Verified record counts and spot-checked data accuracy after the full migration

  • Backed up the original data before switching over

Configuration

  • Set up pipeline stages to match your real sales process

  • Configured required fields and validation rules

  • Set user permissions and access levels by role

  • Built automations for follow-up reminders, lead assignment, and notifications

  • Set up reporting dashboards for the metrics that matter to your team

Integration

  • Connected email and calendar syncing

  • Integrated accounting or invoicing software, if relevant

  • Connected marketing tools (forms, email campaigns, ads)

  • Tested that data flows correctly in both directions between systems

Training & Launch

  • Ran hands-on training with real data, not just a walkthrough demo

  • Created simple reference guides for common tasks

  • Identified a go-to person for questions during the first weeks

  • Set a clear "old system is retired" date so people don't keep using both

After Launch (30/90 Days)

  • Checked in at 30 days on adoption — who's actually using it, and who isn't

  • Reviewed data quality — are required fields actually being filled in?

  • Adjusted pipeline stages or automations based on real usage

  • Reviewed progress against the goals you set at the start

  • Assigned an ongoing owner to keep the CRM clean and useful long-term

Want this checklist handled for you, end to end?

PMD Solutions runs CRM implementations from planning through post-launch review, so nothing on this list gets missed under deadline pressure — and your team isn't the one absorbing the risk.